Transform Your Home

Remodel & Addition Drafting Services

Whether you're updating a tired kitchen, adding a master suite, or expanding your living space with a room addition, you need professional plans to obtain permits and guide construction. At Andalusia Drafting, we create detailed, permit-ready drawings for residential remodels and additions throughout California.

Our remodel plans show existing conditions, proposed changes, and all the technical details contractors need to execute your vision accurately. We understand California building codes and work with building departments across the state to ensure your project gets approved.

All Remodel Types
Room Additions
As-Built Drawings
Title 24 Included
Home remodel and addition plans - Andalusia Drafting California
250+ Remodels Completed
Project Types

Remodel & Addition Services

From single-room updates to whole-house transformations, we draft plans for every renovation scope.

Kitchen Remodels

Layout changes, cabinet configurations, island additions, and open concept conversions. Complete permit drawings for kitchen renovations of any scope.

Bathroom Remodels

Master bath expansions, fixture relocations, and accessibility upgrades. Detailed plans showing plumbing, electrical, and ventilation requirements.

Room Additions

Bedroom additions, family room extensions, and second-story additions. We design additions that integrate seamlessly with your existing home.

Garage Conversions

Convert your garage into living space, home office, or guest quarters. Permit drawings for legal, code-compliant conversions.

Whole House Renovations

Comprehensive remodels that transform your entire home. We document existing conditions and design the complete renovation package.

Enclosed Patios & Sunrooms

Convert outdoor space into year-round living area. Plans for patio enclosures that meet California building requirements.

Deliverables

What's Included in Remodel Plans

Existing Conditions

  • As-Built Floor Plan: Documentation of current layout and dimensions
  • Existing Elevations: Current exterior appearance where affected
  • Site Plan: Property layout showing existing structure footprint

Proposed Design

  • Proposed Floor Plan: New layout with dimensions and annotations
  • Demolition Plan: What's being removed (where applicable)
  • Proposed Elevations: Updated exterior views

Technical Documents

  • Electrical Plan: New circuits, outlets, and fixtures
  • Building Sections: Cross-sections showing construction details
  • Construction Details: Specific assembly requirements
  • Title 24 Compliance: Energy code documentation for alterations
  • Window & Door Schedules: Specifications for new openings
  • General Notes: Code references and construction specifications
Permit Requirements

When Do You Need Permits for Remodeling?

Understanding California permit requirements helps you plan your project properly.

Permits Usually Required

  • Structural changes (moving or removing walls)
  • Room additions or home extensions
  • Adding or relocating plumbing fixtures
  • Electrical panel upgrades or new circuits
  • Window or door size changes in exterior walls
  • Converting garage to living space
  • Adding or modifying HVAC systems
  • Roofing changes that affect structure

Often No Permit Needed

  • Cosmetic updates (paint, flooring, fixtures)
  • Cabinet replacement (same location)
  • Countertop replacement
  • Like-for-like appliance replacement
  • Minor repairs and maintenance
  • Same-location toilet/sink replacement

Note: Requirements vary by city. When in doubt, check with your local building department.

Our Process

How Remodel Drafting Works

01

Project Review

Discuss your renovation goals, scope of work, and timeline. We'll explain what's needed for permits.

02

Document Existing

Create as-built drawings of existing conditions using your measurements or photos.

03

Design Proposed

Develop the proposed design showing all changes clearly marked.

04

Permit Package

Complete permit-ready documents including Title 24 compliance for submission.

Common Questions

Remodel FAQs

It depends on the scope. Cosmetic updates like new cabinets, countertops, and fixtures in the same locations often don't require permits. However, if you're moving plumbing, adding electrical circuits, or changing the layout, you'll need permits. Unpermitted work can cause problems when selling your home and may not be covered by insurance. We can help you understand what's required for your specific project.

Timeline depends on project complexity. Simple remodels (kitchen, bathroom) typically take 1-2 weeks. Room additions usually take 2-3 weeks. Whole-house renovations may take 3-4 weeks. We'll provide a specific timeline during your consultation based on your project scope.

Yes, existing plans are very helpful and can speed up the process. We can use original construction drawings, previous permit drawings, or any documentation you have as a starting point. However, we'll still need to verify current conditions, especially if any unpermitted changes have been made over the years.

Determining if a wall is load-bearing requires analysis of your home's structure. We can help identify potential load-bearing walls based on floor plans and framing patterns. If the wall is structural, a licensed structural engineer will need to design the beam and support system to replace it. We coordinate with engineers regularly for these projects.

Ready to Transform Your Home?

Get a free consultation for your remodel or addition project. Let's create the plans you need to make it happen.